CONCRETE
POUR CARD
Location : Date :
Grid level floor : Pour
NO. :
Drawing
Reference :
Structure : Slab / Column / Beam / Wall / Others Describe ………..
Concrete Grade : Start
Time :
Coarse Aggregate (
nominal size) : Expected end time :
Concrete Quantity :
Construction Joint location :
A
|
REINFORCEMENT
|
REQUIRED
|
ACTUAL
|
TOLERANCE
|
REMARKS
|
a.
b.
c.
d.
e.
f
g.
|
Cover
Cleaning
Spacing
Laps Dimension
Chairs
Stirrups
|
|
|
± 5mm – 2mm
Nil
±10mm
±10mm
|
|
B.
|
|
|
|
|
|
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
|
Shuttering
Materials
Level – Slab / Beam
Bottom
Beam / Column
Dimension
Chamber / Slope
Electrical Inserts
Plumbing Inserts
Cutouts
Length / Height
Width / Thickness
Plumb
Tierod/Props as per
approval
|
|
|
±5mm
in 3000mm
±5mm
in 3000mm
±5mm
in 3000mm
|
|
a.
b.
|
LINES
Top of Concrete
Level
Top of shutter
level
|
|
|
±
3mm
±
3mm
|
|
Approved / Not
approved for concrete
Section Engineer Site
Engineer Const. Manager QA Engineer
Note
:
1. Concrete must be cast against shuttered
surfaces, a vertical stopper at construction joints must be provided.
2. Construction joints must be defined, with in
middle third of spans, considering rate & placement of concrete.
CHECK FOR MASONARY:
Project
Area
/ Building :
Description
of Work / Dr :
|
|
Date
:
Time
:
|
||||
|
|
Required
|
Actual
|
Remarks
|
||
A
|
Specifications
Check
|
|
|
|
||
1
|
Type
of masonary – Brick / Stone / Block
|
|
|
|
||
2
|
Ratio
of motor cement : sand
|
|
|
|
||
B
|
Process
Check
|
|
|
|
||
1
|
Marking
of walls at Floor
|
|
|
|
||
2
|
Plumb
Check Initial
|
|
|
|
||
3
|
Raking
of Joints / Joint Thickness
|
|
|
|
||
4
|
Doors
and Window Opening
|
|
|
|
||
5
|
Reduced
levels of Sill/Lintel/Bottom
|
|
|
|
||
6
|
Plumb
Check – Final
|
|
|
|
||
|
Remarks
|
|
|
|
||
Note
: Record typical dimensional check on reverse of this format
|
||||||
Site
Engineer
|
QA/QC
Engr.
|
Client
/ Consultant
|
CHECKLIST FOR PLASTERING:
|
|
Required
|
Actual
|
Remarks
|
A
|
Specification
Check
|
|
|
|
1
|
Type of
plaster
|
|
|
|
2
|
Mix
Proportion
|
|
|
|
3
|
|
|
|
|
B
|
Work
Check
|
|
|
|
1
|
Plumb
Marks
|
|
|
|
2
|
Correction
of masonry ( if any)
|
|
|
|
3
|
Plaster
Thickness
|
|
|
|
4
|
Base Coat
|
|
|
|
5
|
Finish to
plane/ line (before initial set)
|
|
|
|
6
|
Doors and
windows opening Check
|
|
|
|
7
|
Joint cut
at straight line
|
|
|
|
8
|
Joint
Finish
|
|
|
|
Approved
/ Not Approved
|
||||
Remarks :
|
CHECKLIST FOR WATERPROOFING
SL. NO.
|
DESCRIPTION
|
OK
|
NOT OK
|
REMARKS
|
1
|
Surface
Preparation / Surface Repair ( Removal of Dead Mortar
|
|
|
|
2
|
Leak
check of concrete roof surface by ponding 2”-4” ( 72 hours)
|
|
|
|
3
|
Treatment
of leakages by nozzle grout
|
|
|
|
4
|
Plastering
with WP compoung of Spc. thickness
|
|
|
|
5
|
Slope
check of plaster
|
|
|
|
6
|
Level
Marks for Pressed tiles
|
|
|
|
Remarks
|
||||
|
Checked
by
|
|
Approved
by
|
CHECKLIST OF PAINTING WORK:
Project
|
:
|
|
|
|
Area /
Building
|
:
|
Date :
|
|
|
Description
of work / Drg. Ref.
|
:
|
|
|
|
|
|
Required
|
Actual
|
|
1
|
Material
as per approval
|
|
|
|
2.
|
Color
Shade / Brand
|
|
|
|
3
|
Surface
Preparation
|
|
|
|
4
|
No. of
coat ( thickness in mm )
|
|
|
|
5
|
Coverage
per m2
|
|
|
|
6
|
Curing if
any
|
|
|
|
Approved for next coat / not approved
for next coat
|
||||
Remarks :
|
|
|
CHECKLIST FOR ROADWORK
Date :
Location :
Note Please
tick each boxes and leave columns blank for items not applicable
SL. NO.
|
ITEMS TO CHECK
|
YES
|
NO
|
NA
|
REMARKS
|
1
|
Check for
correct boundary line and diagonals
|
|
|
|
|
2
|
Check for
correct layout marking of buildings & roadCheck if the area is cleared of
bushes etc
|
|
|
|
|
3
|
Check sub
grade levels as per drawings
|
|
|
|
|
4
|
Check any
cross cabling / lines are cutting through road
|
|
|
|
|
5
|
Check for
aggregate grading / thickness of layer
|
|
|
|
|
6
|
Check for
number of passes of roller
|
|
|
|
|
7
|
Check for
unfilled voids after watering
|
|
|
|
|
8
|
Check
whether concreting is free from soil
|
|
|
|
|
10
|
Check
concrete grade in case of concrete road
|
|
|
|
|
11
|
Check for
proper expansion joint
|
|
|
|
|
12
|
Check for
not disturbing the side drains curing rolling operations
|
|
|
|
|
13
|
Check for
gradient and slope
|
|
|
|
|
14
|
Determine
finished level of road / slopes
|
|
|
|
|
15
|
Checkout
for all dead materials are cleared
|
|
|
|
|
Remarks
|
|
|